On August 4, 2022, the Los Angeles Regional Water Quality Control Board submitted a review on the Well Installation Work Plan for the site at 25808 Narbonne Ave. Regional Water Board staff concurs with the Work Plan, provided conditions regarding soil borings, soil samples, groundwater monitoring wells, and review of the borings logs are met. In addition, Responsible Parties are required to submit a technical report detailing the results of the well installation activities to the Regional Water Board by October 31, 2022. View document.
Comments are closed.